Center work. The essence and basic concepts

Geodetic center work is the transfer of a project (drawing) to nature. This is one of the most important points in geodetic activity, which is part of the construction. Its implementation should be handled by professionals. The essence lies in fixing and bringing to the construction site individual points, axes, marks that define the edges of the building and its individual parts. In simple words, this is the definition of the future building using various points.
Stages of the work
The center work in the construction is carried out in several stages:
1. Site assessment;
2. Determining the location of the main building;
3. Determining the location of other objects.
First of all, specialists should evaluate the site, that is, analyze the local terrain, the size of the site, its shape, soils, and illumination. The most important factor is the relief. He dictates the conditions and features of the structure.
Next, the location of the main construction site is determined. Most often it is a house. Its location directly depends on the site, or rather on its size. If the construction site is small, the building is placed in the front part. In the case of a building on a large plot, it is best to build it in the far part.
The final stage of geodetic center work consists in determining the location where the garden, vegetable garden, garage and so on will be located.
The main methods of geodetic center work:
1. Triangulation;
2. Trilateration;
3. Polygonometry;
4. Serifs;
5. The linear method;
6. The method of rectangular coordinates.
How exactly the center work in construction will be carried out, the performance of geodetic works depends on many factors. The most common method is rectangular coordinates. That is, the points of the future building are determined according to the points of the construction grid (a system of points on the surface).
There are several types of center work during the construction process:
1. Construction of design angles;
2. Building a given line;
3. Building axes;
The main reference dimensions in the center work depend on the projected and existing buildings, relief, according to the master plan. After determining the method of geodetic center work, the dimensions for the breakdown are determined and appropriate schemes are created.
Features and important points
In this case, accuracy is above all. The success of the center work lies in the observance of the relevant data, which are transferred to nature. The accuracy of the geodetic grid must be 99.9% correct, and the qualification level of the contractor is high. Another important point is to follow the sequence: everything should happen in stages. Modern equipment should be used to ensure accuracy when performing work. Como obter bônus de cassino sem depósito para registro? É mais fácil do que parece. Visite o site no link acima, escolha um cassino online da lista e não se esqueça de copiar o código promocional exclusivo. Para obter um bônus sem depósito, você precisa especificar o código promocional em um campo especial. Não perca a chance de experimentar a emoção sem arriscar seu dinheiro!